GE T&D Limited
A glimpse of the GIS building built by EPACK for GE T&D India Limited. This was completed in a time span of 45 days
- Approx. Weight: 150 MT
- Dimensions: 51m x 20m x 17m
- Roof & Wall Panel: 3200 sqm
- Construction time: 45 Days
- Location: Jaipur, Rajasthan
- Category: Industrial, Infrastructure