Preparing Your Pre-Engineered Building (PEB) for the Monsoon Season
As the monsoon season approaches, it’s crucial to ensure that your pre-engineered building is well-prepared to withstand the challenges posed by heavy rain and strong winds. This comprehensive pre-monsoon checklist will guide you through essential maintenance tasks to safeguard your building and minimize the risk of water damage and structural issues.
PRE ENGINEERED BUILDINGS
Building Components
- WALL PANEL
- MEZZANINE
- EAVE STRUT
- ROOF PURLIN
- SIDEWALL GIRTS
- RIGID FRAME RAFTER
- RIGID FRAME COLUMN
- TOP RUNNING CRANE
- PARAPET FASCIA
- LEAN-TO BUILDING
- HANDRAIL
- ROOF PLATFORM
- DOWNSPOUT
- ALUMINIUM WINDOW
- ROLL-UP DOOR
- FIXED LOUVERS
- SKYLIGHT
- DOUBLE SLIDING DOOR
- CAGE LADDER
- CANOPY
- EAVE GUTTER
- PARTIAL BLOCKWALL
- INDUSTRIAL LOUVERS
- CORNER TRIM
- PERSONNEL DOOR
Pre-Monsoon Maintenance – Critical Areas
Roof Sheets / Flashings
- Check for blockages in pipes.
- Items which may cause choke.
- Opening of down spout must be at least 1 foot above ground.
Eaves & Valley Gutters
- Regular cleaning required in gutters.
Down Spout Pipes & Other Roof Components
- Ensure clear free flow of water.
- Check for damages due to wind, storm, live movements.
- Check for gaps, improper overlaps.
Miscellaneous Areas
- Check areas which are modified/repaired after execution.
- Check for weak points.
- Check for leakages.
Maintenance of Pre-Engineered Building:
- Standard Maintenance Procedure
- Maintenance of Accessories
- Periodic Schedule for Buildings
- Maintenance Records – Importance
- Safety Measures while Doing Maintenance of Pre Engineered Buildings